Difference between revisions of "JUNO Campus"
(Tag: Visual edit) |
|||
(12 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | [http://www.juno.org.in | + | [http://www.juno.org.in '''JUNO Campus Web-site'''] |
− | JUNO Campus, is an AI-Powered, fully integrated, end-to end automation system designed specifically for education institutions | + | '''JUNO Campus''', is an AI-Powered, fully integrated, end-to end automation system designed specifically for education institutions. |
− | + | It's configurable design ensures a GO-LIVE time of 12 weeks even in some of most complex set-ups. The system has been designed to capture, consolidate and generate data and reports required by AICTE, NAAC, NBA and other regulatory/compliance bodies. | |
− | + | [[File:Implementation-12.png|alt=Implementation-12|none|frame|900x900px|Implementation-12]] | |
+ | '''JUNO Campus''' has a state of art Learning Management System which empowers education institutions with new-age tools to facilitate digital content creation & delivery, performance assessment & tracking and administration. | ||
+ | |||
+ | '''Key Differentiation:''' | ||
+ | * Complete, end-to-end automation through one system (seamlessly information exchange across verticals) | ||
+ | * Configurable design to ensure a swift implementation (Go-Live time reduces to weeks from years) | ||
+ | * Admin can change systems by changing configurations within a matter of minutes (no need to wait for changes in the product) | ||
+ | * Smart combination of level, roles and duties to ensure automation in its existing form (no change in process flow required) | ||
+ | * Complete adherence to all Regulatory and Compliance bodies including NACC, MCI, NBA and Washington Accord (all relevant data can be extracted within minutes) Inbuilt lead management module | ||
+ | |||
+ | '''200+ Successful Implementations in Higher Education Institutions:''' | ||
+ | * Collective intelligence of 200+ Higher Education Institutions Processes/functions adhering to diverse requirement already developed | ||
+ | * Complete, end-to-end automation through one system | ||
+ | * No paper-work. No Excel sheet. No manual process All academic activities completely automated. | ||
+ | * Admission to Alumni | ||
+ | * All support functions including Hostel, Library, HR, Accounts, Purchase, Inventory fully automated | ||
+ | |||
+ | '''Configurable design to ensure a swift implementation:''' | ||
+ | * Short Go-Live time of 3-4 weeks in a typical Eng/Med/MBA/degree college compared to 12-18 months for others | ||
+ | * ROI within 2 years | ||
+ | * The rule-books, policies, workflows, authority-hierarchy of the Institution can be configured AS-IS | ||
+ | * It saves from situation where processes change by the time implementation is completed | ||
+ | * Admin can change systems by changing configurations within a matter of minutes | ||
+ | * Changes can be implemented as soon as they are decided on, without any extra charges | ||
+ | |||
+ | '''Smart combination of level, roles and duties to ensure automation in its existing form''' | ||
+ | * Each employee work profile can exactly be mapped through a combination of level, role and duty. | ||
+ | * Level/role based access ensure privacy and accountability | ||
+ | * Duties can be delegated to any person in system with access to only relevant information | ||
+ | * Especially useful when admins go on leave and they can delegate duties to different people without sharing their login/password | ||
+ | '''Complete adherence to all Regulatory and Compliance bodies including NACC, MCI, NBA and Washington Accord.''' | ||
+ | * All relevant data can be extracted within minutes | ||
+ | * Ready reports | ||
+ | * Saving of significant amount of time and cost spent in data collection, report formation Inbuilt lead management module | ||
+ | * Complete process flow mapping from as exists in real life | ||
+ | |||
+ | '''The system can be deployed both on-Cloud and on-Premise.''' |
Latest revision as of 05:18, 12 August 2019
JUNO Campus, is an AI-Powered, fully integrated, end-to end automation system designed specifically for education institutions.
It's configurable design ensures a GO-LIVE time of 12 weeks even in some of most complex set-ups. The system has been designed to capture, consolidate and generate data and reports required by AICTE, NAAC, NBA and other regulatory/compliance bodies.
JUNO Campus has a state of art Learning Management System which empowers education institutions with new-age tools to facilitate digital content creation & delivery, performance assessment & tracking and administration.
Key Differentiation:
- Complete, end-to-end automation through one system (seamlessly information exchange across verticals)
- Configurable design to ensure a swift implementation (Go-Live time reduces to weeks from years)
- Admin can change systems by changing configurations within a matter of minutes (no need to wait for changes in the product)
- Smart combination of level, roles and duties to ensure automation in its existing form (no change in process flow required)
- Complete adherence to all Regulatory and Compliance bodies including NACC, MCI, NBA and Washington Accord (all relevant data can be extracted within minutes) Inbuilt lead management module
200+ Successful Implementations in Higher Education Institutions:
- Collective intelligence of 200+ Higher Education Institutions Processes/functions adhering to diverse requirement already developed
- Complete, end-to-end automation through one system
- No paper-work. No Excel sheet. No manual process All academic activities completely automated.
- Admission to Alumni
- All support functions including Hostel, Library, HR, Accounts, Purchase, Inventory fully automated
Configurable design to ensure a swift implementation:
- Short Go-Live time of 3-4 weeks in a typical Eng/Med/MBA/degree college compared to 12-18 months for others
- ROI within 2 years
- The rule-books, policies, workflows, authority-hierarchy of the Institution can be configured AS-IS
- It saves from situation where processes change by the time implementation is completed
- Admin can change systems by changing configurations within a matter of minutes
- Changes can be implemented as soon as they are decided on, without any extra charges
Smart combination of level, roles and duties to ensure automation in its existing form
- Each employee work profile can exactly be mapped through a combination of level, role and duty.
- Level/role based access ensure privacy and accountability
- Duties can be delegated to any person in system with access to only relevant information
- Especially useful when admins go on leave and they can delegate duties to different people without sharing their login/password
Complete adherence to all Regulatory and Compliance bodies including NACC, MCI, NBA and Washington Accord.
- All relevant data can be extracted within minutes
- Ready reports
- Saving of significant amount of time and cost spent in data collection, report formation Inbuilt lead management module
- Complete process flow mapping from as exists in real life
The system can be deployed both on-Cloud and on-Premise.